Lifting with Excavators: A Step-by-Step Guide for CPCS Operators

Lifting with Excavators

Ask most 360 operators what their machine is for and they will say digging. Ask them what it actually does in a normal week and you will hear about manhole rings, trench boxes, pipes, kerb packs and road plates. Excavators lift things on almost every site in the country, and that familiarity is exactly where the risk comes from.

The training video this post is based on opens with a line worth remembering:

“Using an excavator for lifting operations should not be taken lightly.”

The moment a load goes on the lifting eye, your excavator is being used as lifting equipment. That brings LOLER (the Lifting Operations and Lifting Equipment Regulations 1998) into play alongside PUWER, and it means the job needs planning, a competent team and a proper sequence. Here is how that sequence works from start to finish.

It Starts with the Lift Plan

Before anything is slung, a competent person must have produced a lift plan that covers the operation you are about to carry out. That plan has to be briefed to the whole lifting team, not left in the site office.

The video sets out three requirements for the people involved:

  • The plan is briefed to everyone taking part in the lift
  • Everyone is trained and competent for their role, including any necessary endorsements
  • The operator is familiarised with the specific excavator being used

That last point catches people out. Holding a blue Competent Operator card for A59 Excavator 360 above 10 tonnes does not mean you know where the lifting mode switch is on a machine you first climbed into this morning. Familiarisation is machine-specific. If you want to understand what goes into the paperwork, our guide to how a lift plan is put together covers the thinking behind it.

Pre-Start Checks and the Rated Capacity Chart

The operator carries out their normal pre-start checks, including the quick hitch, looking for any defect or damage that could affect safe operation. If you need a refresher on the routine, see our step-by-step 360 excavator pre-start checks.

For lifting, there is an extra job: check the rated capacity chart. The machine must have enough capacity for the entirety of the planned lift, which means the furthest radius and the most demanding position, not just the point where you pick the load up.

Two details from the video are worth committing to memory:

  • If the machine has an aftermarket rated capacity indicator (RCI), you must refer to the specific rated capacity chart supplied with that system
  • Rated capacity charts are typically only valid for static duties

“A derating of at least 50 per cent may need to be applied when travelling.”

In other words, the figure on the chart is not the figure you can carry across site.

The Slinger Signaller’s Checks

While the operator checks the machine, the slinger signaller checks the lifting accessories. That includes confirming that reports of thorough examination are present and in date. Chain slings, textile slings, wire rope slings, shackles and any other lifting accessories must be thoroughly examined at least every six months.

This six-month interval comes up time and again in CPCS theory questions. Our LOLER guide for CPCS operators explains the examination requirements in more detail.

Communication and Controlling the Area

Two more things are agreed before the lift begins.

Communication. The method of communication is agreed during the pre-lift briefing. It must suit the environment and be understood by everyone involved. Hand signals are no use if the slinger signaller cannot be seen, and radios are no use if nobody has checked them.

Exclusion. Access to the lift area must be restricted to keep unauthorised people out. That may mean barriers, and it must be monitored. Putting barriers up and then ignoring them is not control.

Setting Up the Excavator

With the checks done, the operator prepares the machine:

  1. Remove the bucket or attachment. Lifting should not be done with anything on the quick hitch. You get better visibility and there is less for the lifting accessories to foul on.
  2. Deploy stabilisers. Any blade or outriggers should be down before the lift starts.
  3. Wheeled machines. For travelling duties, the axle lock must be set to permanently on, and tyre pressures should form part of the pre-start checks.
  4. Position the hitch. Extend the bucket cylinder so the quick hitch lifting eye points downwards.
  5. Enable lifting mode. If the excavator has a dedicated lifting mode, switch it on in line with the manufacturer’s instructions.

The Red Zone and the Thumbs Up

This is the heart of the system and the part most likely to save someone’s life. The red zone is the danger area around the machine. Nobody enters it until the operator has made the machine safe.

The sequence is simple and it never changes:

  1. The operator makes sure the slinger signaller and everyone else is outside the red zone, then positions the machine
  2. The operator isolates the excavator by releasing the dead man’s lever
  3. The operator gives a thumbs up to show it is safe to enter
  4. The slinger signaller approaches and attaches the lifting accessories to the machine
  5. The slinger signaller leaves the red zone and returns the thumbs up

The same routine is repeated when the accessories are attached to the load. The operator positions the accessories over the centre of the load under direction, isolates, signals, and only then does the slinger signaller walk in.

One more requirement from the video:

“There should always be a swivel arrangement included within the lifting accessories.”

The swivel allows the load to rotate without twisting the accessories or loading the lifting point in a way it was not designed for.

Test Lift, Then Lift

Before the load goes anywhere, the slinger signaller directs a test lift. The load is raised just clear so the team can confirm it is balanced and secure. The slinger signaller also checks for debris or loose items that could fall once the load is in the air.

Only then does the lift proper begin, with the operator lifting, moving and lowering under the direction of the slinger signaller. If the lift involves travel, keep the radius to a minimum and the load close to the ground.

Two rules apply throughout:

  • If any rated capacity warning device sounds, stop immediately. Do not finish the movement first.
  • Only the slinger signaller directs the machine, but anyone can stop it. The operator must respond to an emergency stop instruction from any person on site.

For more on the signaller’s side of the job, read our guide to the seven steps of slinging and signalling.

Landing the Load

Finishing the lift follows the same discipline as starting it:

  1. Land the load and keep lowering, under direction, until the lifting accessories go slack
  2. Isolate the excavator with the dead man’s lever and give the thumbs up
  3. The slinger signaller enters, detaches the accessories from the load, leaves the red zone and returns the thumbs up
  4. The operator slowly raises the boom, taking care not to snag the accessories on any part of the load

From there, either the next lift begins or the accessories are removed from the machine using the same isolate-and-signal routine.

Why This Matters for Your CPCS Card

Lifting with excavators appears in the theory for A58 Excavator 360 below 10 tonnes and A59 Excavator 360 above 10 tonnes, and it is a regular feature of blue card renewal tests. Expect questions on lift plans, rated capacity, thorough examination intervals, exclusion zones and who is permitted to direct the operator.

Whether you hold a red Trained Operator card and are building experience, or a blue Competent Operator card coming up for renewal, the examiner wants to see that you understand why each step exists. Under HASAWA you have a duty to look after yourself and those affected by your work. The thumbs-up routine is that duty in practical form.

How CPCS CPD Mastery Fits Into This

Knowing the lifting sequence on site is one thing. Recalling the exact detail under test conditions is another, and that is where regular practice pays off.

CPCS CPD Mastery gives you:

  • 4,000+ practice questions across 43 plant categories, including excavator and lifting operations topics
  • 5 plant calculators to help with the numbers behind safe lifting
  • 8 quick reference guides for checking key facts such as legislation and examination intervals
  • Mock tests that mirror the format of the real renewal test
  • Detailed explanations for every answer, so you learn the reasoning and not just the result

Download CPCS CPD Mastery and work through the lifting operations questions before your next test. A few minutes a day is enough to make the sequence second nature, both in the test centre and in the seat.

CPCS CPD Mastery

Revise on the go with CPCS CPD Mastery

4,200+ practice questions, study guides, and detailed explanations — all in your pocket.

Frequently Asked Questions

Can you use an excavator for lifting operations?
Yes, provided the lift is properly planned. A competent person must produce a lift plan covering the operation, the plan must be briefed to the whole lifting team, and everyone involved must be trained and competent, including holding any necessary endorsements. The excavator must have sufficient rated capacity for the entire lift, and the operator must be familiarised with that specific machine.
Should you lift with the bucket still attached to the excavator?
No. Lifting should not be carried out with a bucket or any other attachment on the quick hitch. Removing the attachment gives the operator better visibility and helps prevent the lifting accessories fouling. The bucket cylinder should then be extended so the quick hitch lifting eye points downwards.
How often must lifting accessories be thoroughly examined?
Chain slings, textile slings, wire rope slings, shackles and all other lifting accessories must be thoroughly examined at least every six months under LOLER. The slinger signaller should check that reports of thorough examination are present and in date as part of their pre-use checks before every lifting operation.
Can an excavator travel with a suspended load?
Only if the lift plan allows for it. Rated capacity charts are typically valid for static duties only, so a derating of at least 50 per cent may need to be applied when travelling. Keep the lift radius to a minimum and the load close to the ground. On a wheeled excavator, the axle lock must be set to permanently on and tyre pressures checked.
What should the operator do if the rated capacity indicator alarm sounds?
Stop the lift immediately. A rated capacity warning means the machine is at or approaching its safe limit for that radius and configuration. Do not try to finish the movement. Stop, make the load safe under the direction of the slinger signaller, and review the lift before continuing.